SOLUTIONS

Examples of installation

Construction of combined heat and power generation room

Installation of base frame
Installation of base frame
Installation of wall frame
Installation of wall frame
Construction of wall and roof
Construction of wall and roof
Completion of combined heat and power generation room construction
Completion of combined heat and power generation room construction

Combined heat and power generation room

Installation of combined heat and power generation set
Installation of combined heat and power generation set
Installation of power generation control panel and ACB panel
Installation of power generation control panel and ACB panel
Installation of auto control panel
Installation of
auto control panel

Installation of waste heat steam generator and steam supply piping

Installation of waste heat steam generator
Installation of waste heat steam generator
Installation of waste heat steam generator
Installation of steam header and soft water joint piping
Installation of steam header and soft water joint piping
Installation of steam header and soft water joint piping
Installation of steam and soft water piping (3F rooftop)
Installation of steam and soft water piping (3F rooftop)
Insulation of steam and soft water supply pipping (3F)
Insulation of steam and soft water supply pipping (3F)

Installation of power generation engine exhaust line and
   medium temperature water piping

Installation of heat exchanger and pump
Installation of
heat exchanger and pump
Installation of power generation engine exhaust line
Installation of
power generation engine exhaust line
Installation of medium temperature water piping
Installation of
medium temperature water piping
Insulation for power generation engine and medium temperature water piping
Insulation for power generation engine and
medium temperature water piping

Installation of city gas supply piping

Installation of gas pipe joint piping in boiler room
Installation of gas pipe joint piping in boiler room
Installation of gas pipe joint piping in boiler room
Installation of gas meter for combined heat and power generation
Installation of gas meter for combined heat and power generation
Installation of gas piping in combined heat and power generation room
Installation of gas piping in combined heat and power generation room
Installation of gas leakage detector and alarm
Installation of gas leakage detector and alarm
Installation of gas leakage detector and alarm

Linkage with KEPCO for combined heat and power generation

Installation of breaker for low-voltage switchboard in substation for linkage with KEPCO
Installation of breaker for low-voltage switchboard
in substation for linkage with KEPCO
Installation of cable tray and power line in substation
Installation of cable tray and power line in substation
Installation of cable tray and
power line in substation
Substation – Installation of power line in combined heat and power generation room
Substation – Installation of power line in combined heat and power generation room
Installation of power line and distribution board in combined heat and power generation room
Installation of power line and distribution board in combined heat and power generation room
Installation of power line and distribution board in combined heat and power generation room